Opens in a new tab

Location: NSW

  • levels 12 13 15 60 castlereagh street 01

    November 16, 2026
    A significant workplace transformation is complete at 60 Castlereagh Street, with new speculative suites delivered across Levels 12, 13 and…
  • end of trip 10 shelley street 01

    November 16, 2026
    A subterranean space transformed into a wellness focused urban sanctuary. At 10 Shelley Street, TCP managed the delivery of an…
  • level 11 175 pitt street 03

    November 16, 2026
    At Level 11, 175 Pitt Street, we brought together a make good, tenancy subdivision and two spec fitouts, including one…
  • level 8 12 shelley street 01

    November 16, 2026
    At Level 8, 12 Shelley Street, TCP managed the adaptive reuse of an existing tenancy for the end user. The…
  • level 2 60 castlereagh street 05

    November 16, 2026
    At Level 2, 60 Castlereagh Street, we brought several workstreams together as part of one project. A make good, a…
  • sebia level 47 8ps 05

    November 16, 2026
    At Level 47, 8 Parramatta Square, TCP managed the tenant fitout for Sebia, a specialist in medical diagnostics. The fitout…
  • 175 pitt street sydney 01

    November 16, 2026
    The lifts at 175 Pitt Street have undergone a full modernisation, including a complete upgrade of the lift interiors. As…
  • 53 east esplanade manly

    October 20, 2026
    TCP is managing upgrade works at this heritage strata building at 53 East Esplanade, Manly, coordinating the required compliance measures…
  • 19 o’connell street

    October 20, 2026
    At 19 O’Connell Street, fire safety upgrade works are being undertaken within a heritage listed building. The project balances fire…
  • 12 Shelley Street, Sydney

    October 20, 2026
    At 12 Shelley Street, a staged program of works is upgrading bathrooms and corridors across various levels, alongside tenant fit…